Supporting Documentation: Operational impacts of incidents affecting PSPC's real property facilities

On this page

Departmental Results Report Calculation

The data contained in this dataset is used in the calculation of a related Departmental Results Report (DRR) indicator: Percentage of time that PSPC’s real property facilities are fully operational. While this indicator, as defined when it was originally created, refers specifically to the "time" element of building operations—and of any incidents that might impact those operations—the calculations behind this indicator have since evolved to instead focus on the percentage of the real property portfolio's floorspace (as measured in metres-squared) that have remained fully operational over a specified timeperiod.

To replicate the DRR calculation as of 2024:

To replicate the DRR calculation prior to 2024:

Related Links

Report a problem or mistake on this page
Date modified: